Sand Casting Zero Emissions Vehicle Case Study
- Aug 24, 2022
- 1 min read
Updated: Oct 3, 2022
SAND CASTING CASE STUDY
PROJECT: Electric Hybrid Scooter
MANUFACTURER: General Foundry Service
CHALLENGE: High performance castings needed in short timeframe
SOLUTION: Using specialized tooling, lead times were reduced by 40% and castings were delivered in three weeks