Sand Casting Zero Emissions Vehicle Case Study



SAND CASTING CASE STUDY


PROJECT: Electric Hybrid Scooter



CHALLENGE: High performance castings needed in short timeframe


SOLUTION: Using specialized tooling, lead times were reduced by 40% and castings were delivered in three weeks